Transgenic Greenhouse temporary electric supply cable installation
Last updated on 19 September 2024
There will be a temporary loss of power to the Transgenic Greenhouse at Irene Manton on Friday 20 September.
This is to allow for the installation of a temporary electric supply cable.
Reason for works/service interruption
Electrification of waste water sterilisation plant in Transgenic Greenhouse
Effects of this interruption upon building occupants
Some intermittent noise (drilling) and temporary loss of power to Transgenic Greenhouse/
For enquiries please contact: Bob Douglass
Contact Mobile: 07957 227094
Email: r.douglass@leeds.ac.uk
If the above member of staff is unavailable or you have any general queries about our services, please contact the Estate Services Helpdesk on 0113 3435555 or e-mail: eshelp@leeds.ac.uk
Thank you for your patience and apologies for any inconvenience caused.