Disruption at Worsley Building

Building Number(s): 0137
Building Name(s): Worsley Building
Date: 29 August 2026 8:00 AM to 29 August 2026 12:00 PM

Is this work scheduled or planned? Yes
Type of work: Maintenance –
Type of disruption: Whole building electrical outage –
Specific rooms/roads/paths/car park spaces affected:

The electrical supplies and equipment NOT supplied from the back up generator will not be operational. All systems with a battery back-up will still be operational for the outage period. The lifts in the building will be isolated.

Please ensure that the necessary shutdown of any sensitive equipment/systems on site is done prior to the shutdown down period.

Background information:

Scheduled black start of the generator supporting the building.

For more information, contact Mick Peat at
Contact Mobile: 07595460991 Email: [email protected]