Isolation of power in the Electronic and Electrical Engineering Buildings
Last updated on 19 September 2023
On Wednesday 23 August from 10am-1pm there will be isolation of power to electrical panel SB2 in Electrical and Electronic Engineering Helium Recovery Suite.
Services to be interrupted
Power services from electrical switch panel SB2 in Electrical and Electronic Engineering Helium Recovery Suite as per the attached plan.
See plan here.
Effects of this interruption
There will be no power to the area as shown on the attached plan between 10am and 1pm. To reduce the risk of nuisance tripping when the power is restored please turn off all equipment in advance.
For enquiries please contact: Adam Ives
Mobile: 07864 802 762
Email: a.ives@leeds.ac.uk
If the above member of staff is unavailable, you have any general queries about our services, please contact the Estate Services Helpdesk on 0113 343 5555 or email: eshelp@leeds.ac.uk
Thank you for your patience and apologies for any inconvenience caused.