Entries by Matthew Shevlin

Ten minutes with Matthew Whiteley

Last updated on 27 February 2024

Last updated on 27 February 2024 Meet Matthew Whiteley, Residence Service Supervisor at the University of Leeds. Matthew is one of the Facilities Directorate’s Staff Voice Champions. The FD Staff Voice is a forum where volunteer representatives from the directorate discuss ideas, questions and concerns raised by their colleagues and work together to find solutions. […]

Electrical shutdown at the Wellcome Trust Brenner Building

Last updated on 22 February 2024

Last updated on 22 February 2024 All electrical power and lighting will be switched off in the Wellcome Trust Brenner Building from 7am to 11am on Saturday 24th February. Services to be interrupted All electrical, power, and lighting. Effects of this interruption upon building occupants No power or lighting throughout the building between the hours […]

Replacement of electric vehicle chargers

Last updated on 23 February 2024

Last updated on 23 February 2024 Parking restrictions will be in place for spaces adjacent to Clothworkers’ Building South from 9pm on Thursday 22nd February to 4pm on Monday 26th February and the Western Lecture Theatre from 9pm on Thursday 22nd February to 4pm on Friday 23rd February to allow for the replacement of electric […]

Electricity supply switch off at University residences

Last updated on 21 February 2024

Last updated on 21 February 2024 The electricity supply will be switched off at a number of University residences while new electricity meters are installed on dates between Monday 4th March and Friday 8th March. Supply will be switched off from 9am to 5pm on days work is scheduled to take place. The affected buildings […]

Installation of new electricity meters on campus

Last updated on 16 February 2024

Last updated on 16 February 2024 The electricity in several buildings on campus will be switched off while new electricity meters are installed. The disruption caused to the electricity supply in each building is expected to last one working day, from 9am to 5pm. Work is scheduled to take place on dates between Tuesday 27th […]

Repairs to Generating Station Complex

Last updated on 14 February 2024

Last updated on 14 February 2024 The Generating Station Complex (GSC) requires urgent repairs to the chilled water system supplying the University campus before the summer. The below buildings will be affected from 8am on Monday 26th February until 10pm on Wednesday 28th February: Garstang Building Irene Manton Building Maths/Earth Environment CEU Building LC Miall […]

New postgraduate research student space opens

Last updated on 7 February 2024

Last updated on 7 February 2024 A new study space and meeting place for University of Leeds postgraduate research students has opened above the Refectory. The new area, which will be staffed by teams from Leeds University Union, provides a mixture of quiet and communal spaces to suit students working independently and collaboratively and building […]

Refurbished Cromer Terrace strength and conditioning facility opens

Last updated on 1 February 2024

Last updated on 1 February 2024 A state-of-the-art strength and conditioning facility at the University of Leeds’ Cromer Terrace that will become a home for the University’s sports clubs and performance athletes has officially opened. The newly refurbished space includes a new strength and conditioning floor alongside physio and massage therapy facilities and will allow […]